Select your filters and click the Search button to search for data, or click Clear to clear all filters
 
Logo Main Menu
Mecklenburg County Health Dept
Public Health Inspections
Select your filters and click the Search button to search for data, or click Clear to clear all filters
 
  
 

Premises Information

Return to Inspections
NamePAUSE STUDIO - SOUTH END - FLOAT TANK 2
Address124 E KINGSTON AV
 
City/State/ZIP
CHARLOTTE NC 28203
Premise Type57 - Year Round Specialized Water Recreation
CountyMecklenburg
Inspection Date 10/29/2026
Final Score @ Grade
12
General CommentsMike Thaler present during the inspection. Permit issued for night swimming. State permit will be available online within 1 business day. Local permit issued while onsite. A follow-up inspection will be completed within 30 to 60 days. Notes: 1) Flow range permitted from 5.5 gpm to 50 gpm to meet turnover and flow restriction of the filter. 2) Portable vacuum required.

Violations

 
CDI=Corrected During Inspection  R=Repeat Violation  VR=Verification Required 
Violation Item Demerits Violation Description CDIRVRComments
5 4 Water quality: daily written records of water quality and test kit kept on site No No No Log book provided. Ensure daily record keeping for bromine, pH, temperature and skimmer/drain repair. Maintain weekly record keeping for total alkalinity. Recommend obtaining DPD powder for testing of Bromine as test strips seem to be not as accurate.
7 4 Pool maintenance: pool walls and floor kept clean, free of debris and in good repair No No No Some metal staining on spa floor/walls. Ensure walls kept clean.
20 4 Premises: caution signs posted at hot water spas No No No Caution signage provided in laminated sign. Signage missing "or low" for Pregnant women, elderly persons, and persons suffering from heart disease, diabetes, or high or low blood pressure should not enter the spa/hot tube without prior medical consultation and permission from their doctor. Missing wording written in with sharpie marker. If replaced with permanent signage, ensure wording and height meets rule requirement.