| Name | NUVO 27 | | Address | 2307 N TRYON ST
| | | | City/State/ZIP | | | Premise Type | 53 - Year-Round Swimming Pool | | County | Mecklenburg | | Inspection Date
| 5/27/2026 | | Final Score @ Grade | | | OSV to pool for return construction. Construction final passed. Permit issued while onsite for no night swimming. All holds released on project. The state permit will be posted online by end of business, 5/27.
Permit Restriction:
1) Flow meter must remain operable. Flow required at 106 gpm to 138 gpm to meet turnover and flow restriction of the suction piping.
Pool Width 27 ft.; Rope Length 40 ft.; Max Depth 5 ft.
Hayward Tristar XL HCP3020VSP, 2.7 THP pump with (2) Aquastar 914xxx 2017 drain covers. EQ lines plugged in skimmers.
A follow-up inspection will be completed within 30-60 days. The inspection will be unannounced. |
|