Select your filters and click the Search button to search for data, or click Clear to clear all filters
 
Logo Main Menu
Mecklenburg County Health Dept
Public Health Inspections
Select your filters and click the Search button to search for data, or click Clear to clear all filters
 
  
 

Premises Information

Return to Inspections
NameEASTON AT MOUNTAIN ISLAND
Address6015 MAR DHEA LN
 
City/State/ZIP
CHARLOTTE NC 28214
Premise Type53 - Year-Round Swimming Pool
CountyMecklenburg
Inspection Date 7/2/2026
Final Score @ Grade
8
General CommentsOSV to pool with Mason Garrett, Hot Springs Pools. Items from previous site visit correct. Lights removed with cap installed over top. Lights to be moved across sidewalk to eliminate horizontal 45" issue. Current caps not <45" to next horizontal on barrier. Permit issued for no night swimming. A follow-up inspection will be completed within 30-60 days of permit issuance. State permit will be posted online by end of business. Pergola built and did not go through plan approval. Pergola blocked off with construction fence. Provide permit numbers. Permits shall be finaled prior to usage. Contractor stated plans were not submitted. Note: 1) Backwash pit built up with walls. Not leaking at time of inspection. Ensure no leaks with backwash. Property still waterproofing the pit. 2) Previous site visit had standing water at corners of deck near landscape on both sides closest to clubhouse. Deck dry. Did not appear to have staining. If standing water an issue after rain event, will require repair in the future. 3) No handles on gates. If installed, ensure 45” from ground. Permit Restriction: Filtration pump flow meter must remain operable. Flow required at 116 gpm to 138 gpm to meet turnover and flow restriction of the suction piping. Pool Width 30 ft.; Rope Length 45 ft.; Max Depth 5 ft. on center. Filtration Pentair Intelliflo3 VSF 011075, 3 hp with (2) Hayward WG1032BHF2 drain covers. EQ lines plugged in skimmer. Feature Pentair Superflo VST 342002, 1.5 hp. Tied into same set of main drains as the filtration system. Backwash line, during backwash, with water hitting drain line for check valve. Move lines to eliminate splash prior to follow-up inspection.

Violations

 
CDI=Corrected During Inspection  R=Repeat Violation  VR=Verification Required 
Violation Item Demerits Violation Description CDIRVRComments
5 4 Water quality: daily written records of water quality and test kit kept on site No No No Main drain checks not recorded daily. Maintain daily record keeping for main drain checks.
24 4 Equipment room: approved pump, filter, and flow meter operating properly No No No Filter pressure gauge not operable. Contractor replaced and provided pictures or operable pressure gauge.