|
44
|
0.50
|
Utensils, equipment & linens: properly stored, dried & handled |
No |
No
|
No |
4-903.11(B)(1) Clean equipment and utensils shall be stored in a self-draining position that allows for air drying.
Observed pans throughout facility stacked before air drying. Allow pans on utensils to completely dry prior to storing. - 0.5 - |
|
55
|
0
|
Physical facilities installed, maintained & clean |
No |
No
|
No |
6-501.11 Floors, walls, and ceilings including the attachments such as soap and towel dispensers; light fixtures; and heat/ac vents shall be maintained in good repair.
Observed floor under dish area handwashing sink and drying shelving with a hole from water line repair. Areas were covered with unsealed wood panels. Per PIC, floors are to be repaired at night after closing in the next couple days. |