|
10
|
1
|
Handwashing sinks supplied & accessible |
No |
No
|
No |
6-301.12 Hand Drying Provision (Pf) All employee handsinks must be equipped with soap, papertowels, and hot water of at least 100F. CDI Paper towels placed at handsink at inspection. |
|
55
|
0.50
|
Physical facilities installed, maintained & clean |
No |
No
|
No |
6-201.11; Core; Wall behind the prep sink must be sealed so not to absorb water. Paint wall or place a nonabsorbent easily cleanable material over the area. Missing coping tile at the back entrance. Maintain all floors, walls, and ceilings so they are in good repair and easy to clean and non absorbent. Evidence of a past water leak on the ceiling in the storage closet. Check for any current leaks an repair and repaint this area. |