49
|
0
|
Non-food contact surfaces clean |
No |
No
|
No |
4-601.11 (B) and (C) Equipment, Food-Contact Surfaces, Nonfood Contact Surfaces, and Utensils (C)
4-602.13 Nonfood Contact Surfaces (C)
Clean the exterior surface of the hot holding cabinets, sides and top roof portion of equipment. Clean the exterior surface of equipment and Blodgett roof lines. Equipment is to be clean. |
|
55
|
0
|
Physical facilities installed, maintained & clean |
No |
Yes
|
No |
6-501.12 Cleaning, Frequency and Restrictions (C)
Clean the floors throughout the kitchen under equipment and around wall edges. Floors in need of pressure washing. Clean the wall lines along the window treatments and window ledges. Cobwebs observed. Paint the door thresholds where observed peeling as well as ceiling pipe lines. Clean ceiling piping surfaces, light fixtures, fans and where dust is observed. Repair the frp wall panel in the old dish room area. Walls are to be clean and in good repair. Floors in the storage area not smooth. Coat the floors where they are smooth and easily cleanable. Floors are to be smooth and easily cleanable. Paint pipe surfaces that are observed peeling, hoods and wall surfaces. Re-paint. Repair broken window along the wall line. Floors, walls and ceiling surfaces are to be clean and in good repair. Workorder already made. Work is to be done during the summer per manager.
6-501.11 Repairing - Premises, Structures, Attachments, and Fixtures - Methods (C) |