4
|
35
|
TOILET FACILITIES: Walls and ceilings clean, nonabsorbent, washable, and in good repair 30#; fixtures clean and in good repair 40#; floors impervious, kept clean 30# (.2408) |
No |
No
|
No |
Repair three out of order toilets in the following school bathrooms: in girls bathroom #3112, ( one toilet that has a clogged drain and is backing up in the second stall), in girls bathroom #2112, (one nonfunctional toilet in the end stall), and in boys bathroom #2110, (one nonfunctional toilet). In boys bathroom #2209 the exposed metal support frame for the removed wall mirror has become bent and damaged. This exposed and damaged metal frame has sharp edges that could be an injury hazard. The metal frame should be removed from the boys bathroom wall as a safety precaution. |
|
6
|
15
|
FLOORS: WALLS: AND CEILINGS: Floors, walls, and ceilings clean and in good repair 30# (.2410) |
No |
No
|
No |
Reinstall and repair loose pane in window on the third floor hallway across from custodial closet #3004. There is a large crack around this loose window pane which could allow rainfall into the building and cause possible water damage. There is also a risk this loose window pane could break in strong winds. Priority repairs are needed to prevent greater damage. Repair the causes of roof and ceiling leaks in the following school building locations: over the stairs located in the front entry lobby, in the hallway by the entrance to classroom #1426, and in the front office conference room #1310. Water stained ceiling panels caused by these ceiling leaks should be replaced after the sources of the leaks have been repaired. |
|
8
|
20
|
LIGHTING AND VENTILATION: Fixtures, grills, vents, blinds, drapes, etc., clean and in good repair 40# (.2412) |
No |
No
|
No |
Repair broken, damaged, and loose baseboard heating system in the #1200 hallway student commons adjacent to the lockers and across the corridor from the entrance of stairway #S-4. This damaged baseboard heater is also adjacent to the glass exterior exit doors. |