4
|
20
|
TOILET FACILITIES: Walls and ceilings clean, nonabsorbent, washable, and in good repair 30#; fixtures clean and in good repair 40#; floors impervious, kept clean 30# (.2408) |
No |
No
|
No |
The toilet in staff bathroom #101F is partially clogged and is backing up frequently per notice of the school custodian. Any blockages in the drain pipe for this toilet should be removed to allow this toilet to flush and drain properly. |
|
5
|
15
|
LAVATORY FACILITIES: Fixtures clean and in good repair 30#; soap and individual towels or approved hand-drying devices provided 40# (.2409) |
No |
No
|
No |
Repair loose water flow control valve on the faucet of the classroom countertop hand wash sink in room #206 |
|
6
|
15
|
FLOORS: WALLS: AND CEILINGS: Floors, walls, and ceilings clean and in good repair 30# (.2410) |
No |
No
|
No |
Replace broken window panes in the breezeway of the #100 hallway at music classroom #129 and on the ground level exterior exit door in stairway #300K. Priority repairs for safety are required due to the broken glass in these window panes. Repair door for the special needs class bathroom #121A. This door becomes stuck in the door frame and does not open easily when closed. Priority repairs for safety are required. Replace two missing drop ceiling panels in staff bathroom #300I. Clean grime, residue, buildup, and cobwebs from the exterior frame of the top floor window in stairway #2300G. Weeds are growing out of the gutters on the school building roof on the front exterior of the school building at the #200 hall above the entry door for stock room #219 and on the right side of the front porch awning at the main entrance. The roof gutters should be cleared of this buildup and weed growth to prevent interior ceiling leaks and to prevent rain water from overflowing the gutters and pooling up around the building foundation which can cause interior flooding. |
|
8
|
20
|
LIGHTING AND VENTILATION: Fixtures, grills, vents, blinds, drapes, etc., clean and in good repair 40# (.2412) |
No |
No
|
No |
Repair the nonfunctional air conditioning system in classroom #214 to allow for adequate ventilation. Repair two nonfunctional ceiling light fixtures in boys bathroom #2300E and two nonfunctional ceiling light fixtures on the #300 hallway by room #311. |
|
11
|
15
|
PREMISES: MISCELLANEOUS: Premises neat, clean 30#; no vector breeding or harborage 20#; pesticides and other toxic materials properly handled and stored 30* (.2415) |
No |
No
|
No |
The playhouse structure on the pre-k playground is covered in grime, build up, and residue and requires pressure wash cleaning. |