3
|
20
|
DRINKING FOUNTAINS: Clean and in good repair 40#; adequate pressure, properly regulated 40# (.2406) |
No |
No
|
No |
Repair three nonfunctional drinking fountains situated between the entrances of boys bathroom #213 and girls bathroom #215. |
|
4
|
35
|
TOILET FACILITIES: Walls and ceilings clean, nonabsorbent, washable, and in good repair 30#; fixtures clean and in good repair 40#; floors impervious, kept clean 30# (.2408) |
No |
No
|
No |
Repair one out of order toilet in the center stall of boys bathroom #213. This toilet has poor water flow for flushing. Replace broken and missing wall tiles by the urinals in boys bathroom #213. Repair one nonfunctional urinal that is first in row in boys bathroom #2211. Repair one toilet in the first stall of boys bathroom #2211. This toilet is loose at the base of the fixture and should be securely attached to the floor. Repair the first urinal in row in boys bathroom #534. This urinal has a clogged drain pipe and is backing up when flushed. Repair the cause of the ceiling leak in staff bathroom #214. The water stained ceiling panels caused by the ceiling leak in this staff bathroom should be replaced after the source of the leak has been fixed. |
|
5
|
15
|
LAVATORY FACILITIES: Fixtures clean and in good repair 30#; soap and individual towels or approved hand-drying devices provided 40# (.2409) |
No |
No
|
No |
Repair loose faucet on the 2nd hand wash sink at the entrance into girls bathroom #414. This faucet should be secured into a fixed position to pour directly into the hand sink basin. |
|
6
|
15
|
FLOORS: WALLS: AND CEILINGS: Floors, walls, and ceilings clean and in good repair 30# (.2410) |
No |
No
|
No |
Repair major roof leaks that are allowing rain water to pour inside of the top level of the H.V.A.C. mechanical room #M-2. Priority repairs are needed to address the roof leaks in this location due to the large numbers of leaks present. Repairs are also necessary to prevent water damage inside of the building and to prevent damage to H.V.A.C. equipment. Repair ceiling leaks in the front office room #100F Repair wall and ceiling leaks at the window in the principals office #100G. The exterior crack in the wall above the window in the principals office, which is the probable source of the leak, should be properly and permanently sealed off with a durable building material. Repair the source of the ceiling leak present in the hallway at room #505. Water stained and damaged ceiling tiles in all of the listed leak locations should be replaced after the causes of the ceiling leaks have been fixed. Water damaged floor tiles caused by the wall and ceiling leaks at the window in the principals office should be replaced. Repair and repaint cracked and damaged walls and ceiling surfaces in the bus loop entry/exit lobby. Repair damaged wall surface and remove or replace torn wall paper from behind drinking fountain by the entrance of boys bathroom #412. |
|
8
|
20
|
LIGHTING AND VENTILATION: Fixtures, grills, vents, blinds, drapes, etc., clean and in good repair 40# (.2412) |
No |
No
|
No |
Repair poorly functioning heating and air conditioning systems in the following school building locations: in the teachers lounge, in classroom #501, in classroom #503, in classroom #505, in classroom #513, in classroom #515, in classroom #517, in classroom #519, in classroom #521, in classroom #523, in classroom #525, and in classroom #527. |
|
11
|
25
|
PREMISES: MISCELLANEOUS: Premises neat, clean 30#; no vector breeding or harborage 20#; pesticides and other toxic materials properly handled and stored 30* (.2415) |
No |
No
|
No |
There is a large deep hole full of standing water adjacent to the sidewalk leading from the glass exit doors of the seventh and eighth grade stairwell to the back parking lot. This hole is at least three feet deep and the standing water in it does not drain out. This sink hole may be the result of a possible underground storm water drain pipe collapse. Priority landscape engineering repairs are needed to stop the sink hole from reforming. Back fill of soil has not worked to address the problem. Priority repairs for safety and sanitation are required due to the potential of trip and fall injuries from the hole and due to the potential of mosquito breeding areas from the standing water. |