Select your filters and click the Search button to search for data, or click Clear to clear all filters
 
Logo Main Menu
Wake County Health Dept
Public Health Inspections
Select your filters and click the Search button to search for data, or click Clear to clear all filters
 
  
 

Premises Information

Return to Inspections
NameOLIVE CHAPEL ELEMENTARY SCHOOL
Address1751 OLIVE CHAPEL RD
 
City/State/ZIP
APEX NC 27502-4862
Premise Type44 - School Building
CountyWake
Inspection Date 2/27/2025
Final Score @ Grade
90
General CommentsSchool facility sanitation inspection completed.

Violations

 
CDI=Corrected During Inspection  R=Repeat Violation  VR=Verification Required 
Violation Item Demerits Violation Description CDIRVRComments
4 35 TOILET FACILITIES: Walls and ceilings clean, nonabsorbent, washable, and in good repair 30#; fixtures clean and in good repair 40#; floors impervious, kept clean 30# (.2408) No No No Repair toilet that is leaking around the base of the fixture and onto the floor in the end toilet stall in girls bathroom #181. Repair ceiling leaks in boys bathroom #113 and in girls bathroom #112 around the ceiling vent. Repair and repaint water stained ceiling surfaces in these bathrooms after the sources of the ceiling leaks have been fixed. Repair and repaint damaged lower wall surface in classroom bathroom #211. Repair and reattach loose lower wall base tile in classroom bathroom #220. Replace missing tank lid on toilet in class bathroom of trailer #504. Repair roof and ceiling leaks in the class bathroom of trailer #505. Replace water stained ceiling panels in this bathroom after the roof leak is fixed. Repair and stabilize sagging subfloor behind toilet in the fourth stall of the girls bathroom in the restroom trailer.
5 15 LAVATORY FACILITIES: Fixtures clean and in good repair 30#; soap and individual towels or approved hand-drying devices provided 40# (.2409) No No No Repair nonfunctional hand wash sink at the entrance into boys bathroom #148.
6 15 FLOORS: WALLS: AND CEILINGS: Floors, walls, and ceilings clean and in good repair 30# (.2410) No No No Repair major roof and ceiling leaks in the classroom of trailer #505. Repair the water damaged ceiling area in the classroom of trailer #505 after the roof leaks have been fixed. Repair and stabilize the sagging subfloor near the entrance of the class bathroom in trailer #505. Replace missing and broken floor tiles in the classroom of trailer #505. Replace broken floor tiles in the classroom of trailer #503. Repair ceiling leaks in the following main school building locations: in the hallway at the entrance to girls bathroom #147, in the hallway at the entry/exit doors near room #212, in classroom #221, and in classroom #212. Replace water stained ceiling panels in these ceiling leak locations after the causes of the leaks have been fixed. Repaint chipping ceiling surface in the hallway at room #411. Replace missing ceiling panels over the gym stage.
8 20 LIGHTING AND VENTILATION: Fixtures, grills, vents, blinds, drapes, etc., clean and in good repair 40# (.2412) No No No Replace loose and broken vent cover on the ceiling ventilation ductwork in the gym. Replace missing ceiling vent cover in classroom #202.
11 15 PREMISES: MISCELLANEOUS: Premises neat, clean 30#; no vector breeding or harborage 20#; pesticides and other toxic materials properly handled and stored 30* (.2415) No No No Repair loose sliding and climbing pole on the playground structure adjacent to the drama class trailer. Replace missing coverings on the climbing cables on the web play structure on the playground behind the cafeteria kitchen. Repairs for safety are needed.