| Name | WAYFORD AT INNOVATION PARK | | Address | 1018 CATALYST BLVD
| | | | City/State/ZIP | | | Premise Type | 53 - Year-Round Swimming Pool | | County | Mecklenburg | | Inspection Date
| 5/20/2024 | | Final Score @ Grade | | | Observed no non-compliant conditions.
Permit restriction: Pump required to be at max speed.
Note: Pump does not meet turnover by 4gpm. If clarity or chemistry issues occur due to lack of turnover a properly sized pump will be required to be installed. |
|