55
|
0
|
Physical facilities installed, maintained & clean |
No |
Yes
|
No |
Observed absorbent ceiling tiles above the serving line. 6-201.11 The establishment must provide floors, floor coverings, walls, wall coverings, and ceilings designed, constructed, and installed to be smooth and easily cleanable. A work order has been placed and previous items have been repaired. |
|
56
|
0
|
Meets ventilation & lighting requirements; designated areas used |
No |
Yes
|
No |
Observed the lighting intensity in the dry storage area with rolling shelves has about .5 foot candles in the back corner and the dry storage area beside that has 2-6 foot candles of light. 6-303.11 In dry storage spaces, the light intensity must be at least 10-foot candles. PIC has a work order placed for these items and most lights have already been replaced. |