| Name | CAMDEN NODA | | Address | 515 JORDAN PL
| | | | City/State/ZIP | | | Premise Type | 50 - Seasonal Swimming Pool | | County | Mecklenburg | | Inspection Date
| 4/6/2023 | | Final Score @ Grade | | | Onsite visit to pool for return construction and operating permit inspection. SCH40 parts of FlowVis flow meter with SCH80 casing installed per mfg. instructions reading 125 gpm. Construction final passed. Holds released in system. Operating permit issued for no night swimming.
Notes:
1.Facility provided signage missing “Children should not use the swimming pool without adult supervision” in 1” lettering. If generic pool rules sign removed (white and blue), pool rules signage must meet code requirements.
2.Polymeric sand added to pavers. Recently added and not set in some shaded areas. Ensure all areas set. Polymeric sand required for pavers for impervious surface.
3.Barrier between building and pool does not meet code requirements. Distance between horizontals is less than 45”. Barrier is pool building and gate that lines the street along with brick wall.
4.Warning No Lifeguard sign located across pool on wall must remain in place unless additional warning signage is added to entry near restrooms.
Permit Restrictions:
1)Double gate entry at street must have one gate permanently affixed when not in use.
2)Flow meter must remain operable. Flow range must be kept at 118 - 138 gpm to meet turnover and return pipe size restriction.
3)Polymeric sand must remain intact for impervious surface on pavers.
4)Pool is not approved for salt as primary chlorination.
5)Pool barrier is building and gate that lines the street along the brick wall. Barrier between building and pool does not meet code.
6)Double doors from club room shall have one door permanently affixed to ensure self-closing, self-latching.
Pool Width 36 ft.; Rope Length 50 ft.; Max Depth 5 ft.
Pentair IntellifloXF VSF, 022056 with (2) VGBA-2017 Aquastar 12MFxxx drain covers. EQ lines plugged in skimmer/plastered on wall.
An un-announced follow-up inspection will be conducted within 30 days of permit issuance. |
|