|
3
|
6
|
Water quality: pool water pH |
No |
No
|
No |
.2535(1) Maintain pH at 7.2 to 7.8. Observed pH to be below 7.0 on the kit. Closure issued for pH. Immediate Suspension issued. |
|
12
|
4
|
Pool maintenance: inlets and other fittings in place and in good repair |
No |
No
|
No |
Missing eyeball fitting at pool steps. .2537(8) Fittings and/or face plates shall be replaced when damaged and kept in good repair. |
|
15
|
6
|
Premises: body hook and ring buoy with throw rope or lifeguard with rescue tube provided and properly located |
No |
No
|
No |
.2530(a) Lifesaving equipment includes body hook and pole and USCG approved ring buoy with required rope length. Observed rope to be at 47 feet 10 inches when 50 foot exact length is required for this pool. Rope was corrected, new rope was attached and made the correct length. -CDI |
|
17
|
4
|
Premises: decks unobstructed, properly drained, free of trip hazards |
No |
No
|
No |
.2537(2) Decks shall be kept in good repair.
.2537(2) Decks shall be kept free of trip hazards or offsets greater than 1/2" due to deterioration or changes from original deck profile. Observed numerous deck pavers damaged and/or off-set. This is not bad enough for closure or deadline at this time, but these items need repair before they become worse. |