|
1
|
1
|
Floors and carpets cleanable, clean, good repair; carpet odor free |
No |
No
|
No |
1309 (a) and (b) The floors in an institution shall be made of smooth, non-absorbent materials and shall be kept clean and in good repair. When carpet is present, it must be kept clean, odor free, and in good repair.- Observed debris and dusts on flooring underneath the beds, corners of the rooms, behind furniture 105, 109, 214, 205. Detail cleaning needed and keep floor clean. |
|
11
|
0
|
EPA registered disinfectants used according to manufacturers' instructions; approved testing methods and devices used |
No |
No
|
No |
General Comment:
.1312 (e) EPA registered disinfectants shall be used in accordance with the manufacturer's instructions. When EPA registered disinfectants are mixed and prepared by institution employees, a measuring device, chemical testing device, or the methods and devices prescribed by the chemical manufacturer shall be used to prepare the concentration of chemicals in accordance with the disinfectant's label and the manufacturer's instructions.- Observed the facility is using an approved cleaning/disinfectant products located in janitor closet. When asked a housekeeper, no knowledge about contact time, how to clean effectively. According to conversation, observed only floor and glass cleaning bottles on a cleaning cart without labeled. All cleaning bottles should be on a cart ready to use, and should have clear labels/instructions. |
|
16
|
1.50
|
Hot water between 105°F and 116°F |
No |
No
|
No |
.1313 (d) Institutions shall provide water heating facilities. Hot and cold running water under pressure shall be provided to carry out all operations. Hot water shall be provided at temperatures between 105 degrees Fahrenheit and 116 degrees Fahrenheit at handwashing and bathing facilities.- Observed hot water temperature in building 1 measured at 90F -94F, and building 2 measured at 80F -104 F. Ensure to provide hot water between 105F and 116F at all time.
Note: the facility called the company to come and check the water heater, the work to be completed this week according to maintenance. |