6
|
6
|
Submerged suction outlets meet ASME/ANSI A112.19.8-2007. Single drains protected. (.2537, .2539) GPM= ____Field verification complete=____ |
No |
No
|
No |
Screw loose in main drain. Tightened during the inspection. |
|
16
|
4
|
Premises: fence or barrier with self-closing, self-latching gates properly constructed and maintained |
No |
No
|
No |
>4" between post and picket at tie into building near pump room. Added wood to decrease opening as temporary repair. <4" at time of inspection.
Ledge near front leasing office tie in near fitness center provides foothold. Added angle piece to eliminate foothold on building.
Rock drainage areas with >2" from ground to bottom of barrier. Piled rocks during inspection. Must maintain 2" or less at all times. |
|
23
|
4
|
Equipment room: chlorine or bromine automatic feeders that meet NSF Standard 50 |
No |
No
|
No |
Drain valve on chlorinator leaking. Added plug to valve during inspection to repair leak. |
|
25
|
2
|
Equipment room: equipment and chemicals kept in a dry, well-ventilated enclosure |
No |
No
|
No |
Floor wet in pump room around chlorinator due to leak at drain valve. Keep pump room floor dry. |