Select your filters and click the Search button to search for data, or click Clear to clear all filters
 
Logo Main Menu
Mecklenburg County Health Dept
Public Health Inspections
Select your filters and click the Search button to search for data, or click Clear to clear all filters
 
  
 

Premises Information

Return to Inspections
NamePINE 25 NORTHEND
Address321 W 26TH ST
 
City/State/ZIP
CHARLOTTE NC 28206
Premise Type53 - Year-Round Swimming Pool
CountyMecklenburg
Inspection Date 7/15/2021
Final Score @ Grade
6
General CommentsOnsite visit to pool for return construction and operating permit inspection. Michael Morgan and Andrew Jones present during the inspection. CPO Nick Durden present during the inspection. F-1000 flow meter installed per mfg. instructions. New piping run in pump room. New flow meter addressed by engineer in engineer letter. Deck drains installed under rock area and under paver section. Water put on deck and appears to be draining adequately. Pool Width - 28 ft.; Rope Length - 42 ft.; Max Depth - 5 ft. Pentair Intelliflo 011056, 3 hp pump with (2) Lawson MLD-SG-0909 drain covers. EQ lines plugged in skimmer. Permit Restrictions - 1) Pump must remain set at 3450 RPM for filtration. For backwash, pump shall be backwashed at 2350 RPM. Pit cannot handle max flow of pump. 2) Pool not approved for salt as primary chlorination. Ensure handrails are marine grade. 3) Battery back-up must remain operable. Permit issued for no night swimming. If seeking night swimming approval, a return visit will be made to verify sufficient lighting is provided. An unannounced follow-up inspection will be completed within 30 days by EHS. All holds released on the project.

Violations

 
CDI=Corrected During Inspection  R=Repeat Violation  VR=Verification Required 
Violation Item Demerits Violation Description CDIRVRComments
5 4 Water quality: daily written records of water quality and test kit kept on site No No No No log book provided. Operator had yet to take over pool. Maintain daily record keeping for chlorine, pH and main drain checks. Maintain weekly record keeping for cyanuric acid and total alkalinity. Provide generic log book sheet to pool operator.
29 2 Dressing and sanitary facilities: required fixtures provided, clean, and in good repair No No No No toilet paper or soap in restrooms. Corrected during the inspection.