|
7
|
4
|
Pool maintenance: pool walls and floor kept clean, free of debris and in good repair |
No |
No
|
No |
.2537(14) Keep pool surface and pool floor free of debris. Observed brownish staining on pool walls under both ladders. |
|
15
|
6
|
Premises: body hook and ring buoy with throw rope or lifeguard with rescue tube provided and properly located |
No |
No
|
No |
.2530(a) Provide ring buoy for rope 1.5 times the width of the pool or 50 ft whichever is less. Observed ring buoy with new rope that was greater than 30’ as required by pool. CDI-CPO cut and shortened rope to 30’. |
|
17
|
4
|
Premises: decks unobstructed, properly drained, free of trip hazards |
No |
No
|
No |
.2537(2) Decks shall be kept free of trip hazards or offsets greater than 1/2" due to deterioration or changes from original deck profile. Observed three offsets on pool deck, one to the left of the 3.5” depth marker near pool steps (3/4”), one on the right side of pool steps (1”), and the other to the right of the right side pool ladder, in between the 4ft and 5ft depth markers (1/2”). |
|
25
|
2
|
Equipment room: equipment and chemicals kept in a dry, well-ventilated enclosure |
No |
No
|
No |
.2534(2) Pools constructed after April 1, 2004 shall provide a separate room for chemical storage meeting Rule.2534. Observed pool chemicals stored in pump room. Pool has separate chemical storage room with proper lighting and cross-ventilation on other side of pool. CDI-CPO moved chemicals to chemical storage room. |