|
25
|
2
|
Equipment room: equipment and chemicals kept in a dry, well-ventilated enclosure |
No |
No
|
No |
Pump room/chemical storage room floor wet due to operator spraying down floor prior to inspection. Ensure kept dry. |
|
29
|
2
|
Dressing and sanitary facilities: required fixtures provided, clean, and in good repair |
No |
No
|
No |
Hot water in restrooms >110 F. Water heater not part of renovation. Maintain at 110 F or below. |