| Violation Item
| Demerits
| Violation Description
| CDI | R | VR |
|
|
5
|
4
|
Water quality: daily written records of water quality and test kit kept on site |
No |
No
|
No |
CYA slightly above 100 ppm. Lower to below 100 ppm. Intent to suspend issued. |
|
7
|
4
|
Pool maintenance: pool walls and floor kept clean, free of debris and in good repair |
No |
No
|
No |
Pool floor with chipping/cracking paint. Areas with larger areas of chipping paint require repair prior to 2027 operating permit. Ensure pool floor kept in good repair. No sharp edges at time of inspection. |
|
9
|
4
|
Pool maintenance: depth markings and no diving markers or signs visible and properly located |
No |
No
|
No |
No Diving marker blocked by basketball hoop on deck. Moved during the inspection. |
|
11
|
2
|
Pool maintenance: diving equipment, ladders, steps and handrails properly placed, in good repair |
No |
No
|
No |
Step handrail loose at steps closest to building. Tighten handrail. |
|
15
|
6
|
Premises: body hook and ring buoy with throw rope or lifeguard with rescue tube provided and properly located |
No |
No
|
No |
General Comment: Grab rope on ring buoy starting to degrade. Replace with USCG approved ring buoy. One screw bolt rusted body hook. Replace bolt to ensure secure.
Ring buoy rope 1 ft too short. Lengthened at tie on during inspection. |
|
16
|
4
|
Premises: fence or barrier with self-closing, self-latching gates properly constructed and maintained |
No |
No
|
No |
No access to resident doors that lead directly on to the pool deck. Doors shall self-close, self-latch or self-close with audible alarm. Intent to Suspend issued. |
|
21
|
4
|
Premises: pool and deck lighting provided at pools that operate at night |
No |
No
|
No |
Pool hours indicate 5 am to 11 pm. Pool is NOT approved for night swimming. Provide documentation that property has sufficient lighting for night swimming approval or adjust hours to reflect dawn to dusk. Intent to suspend issued. |
|
23
|
4
|
Equipment room: chlorine or bromine automatic feeders that meet NSF Standard 50 |
No |
No
|
No |
No flow meter on chlorinator. If repaired/replaced, install flow meter per NSF approval. |
|
25
|
2
|
Equipment room: equipment and chemicals kept in a dry, well-ventilated enclosure |
No |
No
|
No |
Pump room floor wet. Appears to be a leak around heater. Could not locate. Keep pump room floor dry. Eliminate leaks. |
|
29
|
2
|
Dressing and sanitary facilities: required fixtures provided, clean, and in good repair |
No |
No
|
No |
Hot water in restrooms >113 F. Maintain at 110 F or below. |
|
33
|
2
|
Dressing and sanitary facilities: hose bibbs and floor drains provided |
No |
No
|
No |
No hose bibs in restrooms. Original construction. Provide hose bib with backflow prevention within 50 ft. of restrooms. |