|
5
|
4
|
Water quality: daily written records of water quality and test kit kept on site |
No |
No
|
No |
Cyanuric acid and total alkalinity not recorded weekly. Missing some weeks. Record weekly.
No pH indicator reagent. Provided during the inspection. |
|
8
|
4
|
Pool maintenance: surface skimmers (with weirs, baskets and covers) or gutters clean, in good repair, and functioning properly, no floating debris |
No |
No
|
No |
One of four skimmer weirs sticking. Keep operable. |
|
12
|
4
|
Pool maintenance: inlets and other fittings in place and in good repair |
No |
No
|
No |
One fitting at steps missing. Fitting not threaded. All other returns have fittings. Repair to ensure flow throughout pool. |
|
23
|
4
|
Equipment room: chlorine or bromine automatic feeders that meet NSF Standard 50 |
No |
No
|
No |
No flow meter on Pentair 300-29x chlorinator. Provide flow meter per NSF requirement on chlorinator. Original installation. |
|
24
|
4
|
Equipment room: approved pump, filter, and flow meter operating properly |
No |
No
|
No |
Flow meter not operable. Design flow of pump is at 100 gpm. Flow meter only begins at 100 gpm. Ensure correct flow meter installed on the return line. Requires repair prior to 2022 operating permit. Flow meter not installed per mfg. instructions. Install per mfg. instructions if replaced. Flow meter must be capable be capable of at least 150 gpm.
Small leak at filter. Repair leak. |
|
25
|
2
|
Equipment room: equipment and chemicals kept in a dry, well-ventilated enclosure |
No |
No
|
No |
Bicarb bags on floor in pump room. Store in chemical storage room up off floor. |
|
33
|
2
|
Dressing and sanitary facilities: hose bibbs and floor drains provided |
No |
No
|
No |
No hose bib in restrooms. Provide with backflow prevention device. Original construction. |