|
10
|
1
|
Handwashing sinks supplied & accessible |
Yes |
No
|
No |
6-301.11 Provide soap for handwashing at each handsink. -Pf Observed no soap stocked at handsink adjacent to hot holding area. CDI- soap provided by PIC during inspection. |
|
51
|
0
|
Plumbing installed; proper backflow devices |
Yes |
No
|
No |
5-205.15 Maintain a plumbing system in good repair. Observed handsinks leaking from piping during inspection. CDI- PIC hand tightened piping, no longer leaking at end of inspection. |