Select your filters and click the Search button to search for data, or click Clear to clear all filters
 
Logo Main Menu
Mecklenburg County Health Dept
Public Health Inspections
Select your filters and click the Search button to search for data, or click Clear to clear all filters
 
  
 

Premises Information

Return to Inspections
NameATHERTON, THE
Address2100 SOUTH BLVD
 
City/State/ZIP
CHARLOTTE NC 28203
Premise Type53 - Year-Round Swimming Pool
CountyMecklenburg
Inspection Date 3/14/2023
Final Score @ Grade
8
General CommentsInspection conducted with Josh Ledbetter. Flow meter verified to be operational with flow at 110 gpm which complies with permit restriction of flow less than 154 gpm due to wall main drain cover rating. .2528 - EHS unable to determine if window limiters are in place on private residence windows that open directly to pool deck. Night swimming not approved at this time. Pool may only be used between dawn and dusk. If night swimming is desired, contact Chris Elmore to request a night swimming visit. Note: ring buoy hanging behind pool seating which may be hard to access during emergency. EHS recommends relocating to alternate area away from any obstructions.

Violations

 
CDI=Corrected During Inspection  R=Repeat Violation  VR=Verification Required 
Violation Item Demerits Violation Description CDIRVRComments
7 4 Pool maintenance: pool walls and floor kept clean, free of debris and in good repair No No No .2537(14) Keep pool surface and pool floor free of debris. Debris buildup on wall covers. Cleaned during inspection.
17 4 Premises: decks unobstructed, properly drained, free of trip hazards No No No .2537(2) Decks shall be kept free of trip hazards or offsets greater than 1/2" due to deterioration or changes from original deck profile. Various areas of missing/low sand grouting around decking tiles at pool edge resulting in offsets greater than 1/2”. Operator filled during inspection. Overall deck profile with some areas of settling and areas of deteriorating grouting. Deck improvements and/or repairs may be necessary this season to continue to meet standards. Operator noted that they are in process of getting bids for deck work. EHS emailed in field plan review application. Submit application along with scope of deck work to the department prior to beginning work.