|
2
|
6
|
Water quality: disinfectant residual provided by |
No |
No
|
No |
G.S. 130A-2(3) Chlorine added directly to swimming pool. Chlorination must occur through chlorinator. Eliminate direct hazard to public. Observed facility manually adding liquid chlorine to pool. CDI- informed that chlorination must occur through chlorinator; chlorine tablets were added to erosion feeder. |
|
15
|
6
|
Premises: body hook and ring buoy with throw rope or lifeguard with rescue tube provided and properly located |
No |
No
|
No |
.2530(a) Provide ring buoy for rope 1.5 times the width of the pool or 50 ft whichever is less. Observed throw rope connected to ring buoy deteriorated. CDI- rope was replaced. |