|
2
|
0
|
Certified Food Protection Manager |
No |
No
|
No |
2-102.12 (A) PIC shall demonstrate knowledge by being a certified food protection manager. Observed facility without a certified protection manager onsite during inspection.
For more information on becoming a certified food protection manager please visit: https://health.mecknc.gov/envhealth/food-and-facilities-sanitation |
|
5
|
0
|
Procedures for responding to vomiting & diarrheal events |
Yes |
No
|
No |
2-501.11 A food establishment shall have written procedures for employees to follow when responding to vomiting or diarrheal events. -Pf. Observed facility without written procedures for vomit/diarrhea clean up. CDI: EHS provided written procedures.
For more information please visit: https://health.mecknc.gov/envhealth/food-and-facilities-sanitation |
|
21
|
0
|
Proper hot holding temperatures |
Yes |
No
|
No |
3-501.16(A)(1) Maintain TCS foods in hot holding at 135F or above. -P. Observed breakfast sandwiches hot holding below 135F. CDI: PIC reheated items to above 165F.
For more information, please visit: https://health.mecknc.gov/envhealth/food-and-facilities-sanitation or view our training videos at the following weblinks: What are TCS Foods https://youtu.be/bRvqAETDjQU and Safe Food Temperatures https://youtu.be/tXP09IK-1TQ . |
|
22
|
1.50
|
Proper cold holding temperatures |
Yes |
No
|
No |
3-501.16(A)(2) Maintain TCS foods in cold holding at 41F or less. -P. Observed salsa, boiled eggs, milk and oat milk above 41F. CDI: Items were voluntarily discarded.
For more information, please visit: https://health.mecknc.gov/envhealth/food-and-facilities-sanitation or view our training videos at the following weblinks: What are TCS Foods https://youtu.be/bRvqAETDjQU and Safe Food Temperatures https://youtu.be/tXP09IK-1TQ . |
|
36
|
0.50
|
Thermometers provided & accurate |
No |
No
|
No |
4-302.12 Provide an accessible thermometer for use. Provide a thin probe thermometer for accurate measure of thin foods.-Pf . Observed facility with a thick probe thermometer. Verification required within 10 days. |