| Name | SANCTUARY AT STONEHAVEN II, THE | | Address | 6001 BISMARK PL
| | | | City/State/ZIP | | | Premise Type | 43 - Residential Care | | County | Mecklenburg | | Inspection Date
| 6/28/2019 | | Final Score @ Grade | | | On site visit with Lev Saks and Jessica Saks for construction final/inspection. The following items must be completed prior to residents moving into the home:
-Finish cleaning up construction dust.
-Caulk all gaps between counter and wall at all sinks.
-Assemble all furiniture and closet organization shelving.
-Provide a soiled clothing/linen hamper for each resident.
-Provide soap and towels at all lavatories. Individual towels in common areas.
-Provide thermometers in refrigeration units.
-Install locable storage for hazardous products (detergents, cleaners, pesticide, etc.) |
|