|
6
|
6
|
Submerged suction outlets meet ASME/ANSI A112.19.8-2007. Single drains protected. (.2537, .2539) GPM= ____Field verification complete=____ |
No |
No
|
No |
.2539(c) All pools, prior to permit issuance, shall provide documentation to the Department to verify suction outlet safety compliance. No PDSC form submitted for new pump installation. Submit new pool drain suction compliance form to health department for review and approval. Permit suspended. |
|
22
|
6
|
Premises: emergency telephone provided |
No |
No
|
No |
.2530(f) Emergency phone shall remain operable. Phone was not able to connect to 911. Permit suspended. |
|
25
|
2
|
Equipment room: equipment and chemicals kept in a dry, well-ventilated enclosure |
No |
No
|
No |
.2533(a) The equipment room door shall have a permanent lock and be kept locked when not in use by the pool operator. Observed pump room unlocked. |