23
|
4
|
Equipment room: chlorine or bromine automatic feeders that meet NSF Standard 50 |
No |
No
|
No |
No flow meter on chlorinator. Original construction. If repaired/replaced, install per mfg. instructions and NSF approval. |
|
25
|
2
|
Equipment room: equipment and chemicals kept in a dry, well-ventilated enclosure |
No |
No
|
No |
Pump room floor wet due to cooler leak. Keep pump room floor dry. |
|
30
|
2
|
Dressing and sanitary facilities: approved water source, no cross connections |
No |
No
|
No |
No check valve on fill line to pool. Original construction. Check valve shall be provided meeting rule of ASSE standards. |
|
33
|
2
|
Dressing and sanitary facilities: hose bibbs and floor drains provided |
No |
No
|
No |
No hose bib in pool restrooms. Provide hose bib with backflow prevention device. |