|
3
|
6
|
Water quality: pool water pH |
No |
No
|
No |
Pool pH at 7.0. Corrected to 7.2 during the inspection. |
|
5
|
4
|
Water quality: daily written records of water quality and test kit kept on site |
No |
No
|
No |
No log book and some test kit reagents expired. Pool has been closed and has not been maintaining records. Maintain daily record keeping for chlorine, pH and main drain checks. Record total alkalinity and cyanuric acid weekly. Replace test kit reagents. |
|
8
|
4
|
Pool maintenance: surface skimmers (with weirs, baskets and covers) or gutters clean, in good repair, and functioning properly, no floating debris |
No |
No
|
No |
One skimmer with debris. Emptied during the inspection. |
|
17
|
4
|
Premises: decks unobstructed, properly drained, free of trip hazards |
No |
No
|
No |
Damage to deck drain in one location. Filled to eliminate hazard during the inspection.
Some pool furniture <4 ft. to pool edge. Maintain 6 ft. clearance around the pool in all areas. |
|
23
|
4
|
Equipment room: chlorine or bromine automatic feeders that meet NSF Standard 50 |
No |
No
|
No |
No flow meter on chlorinator. Original construction. If repaired/replaced, install per mfg. instructions and NSF approval. |
|
25
|
2
|
Equipment room: equipment and chemicals kept in a dry, well-ventilated enclosure |
No |
No
|
No |
Pump room floor wet due to cooler leak. Keep pump room floor dry. |
|
30
|
2
|
Dressing and sanitary facilities: approved water source, no cross connections |
No |
No
|
No |
No check valve on fill line to pool. Original construction. Check valve shall be provided meeting rule of ASSE standards. |
|
33
|
2
|
Dressing and sanitary facilities: hose bibbs and floor drains provided |
No |
No
|
No |
No hose bib in pool restrooms. Provide hose bib with backflow prevention device. |