|
2
|
55
|
SANITARY SEWAGE DISPOSAL: Sewage collected, treated, and disposed of by an approved method 150*; system properly operated and maintained 55* (.2407) |
No |
No
|
No |
All sewage and other liquid wastes shall be disposed of in a public sewer system or, in the absence of a public sewer system, by an approved, properly operating sanitary sewage system. 15A NCAC 18A 2407. Observed drain in girls and boys locker room closets not operating properly and standing water on floors. |
|
5
|
20
|
LAVATORY FACILITIES: Fixtures clean and in good repair 30#; soap and individual towels or approved hand-drying devices provided 40# (.2409) |
No |
No
|
No |
Soap and individual towels or approved hand-drying devices shall be provided. 15A NCAC 18A .2409 (c). Observed hand dryers not operating in A, B, and C halls. Needs repair. |
|
6
|
30
|
FLOORS: WALLS: AND CEILINGS: Floors, walls, and ceilings clean and in good repair 30# (.2410) |
No |
No
|
No |
Floors, walls, and ceilings of all areas shall be kept clean and in good repair. 15A NCAC 18A .2410. Observed black build up around drain in boys locker room closet. Observed build up in Vest room floor connected to girls locker room. Needs cleaning. Observed stained ceiling tiles in D4, Art room, and E hall. Check for leaks and repair. REPEAT. |