|
52
|
1
|
Sewage & wastewater properly disposed |
Yes |
No
|
No |
5-402.13 Conveying Sewage (P) Discharge pipe under MFU was broken during time of inspection and wastewater was flowing directly onto ground. Wastewater should be discharged into an approved system. MFU temporarily suspended operations, plumber was called and pipe was fixed. CDI |