|
55
|
0
|
Physical facilities installed, maintained & clean |
No |
No
|
No |
6-201.11 Floors, Walls and Ceilings - Cleanability (C)
PIC put a work order in for the floor tile noted in the previous inspection. The grout was only half way done on the tile and will need to be done correctly. There are still large gaps within the floor tile grout where food and other debris can cause potential for contamination. |