|
55
|
1
|
Physical facilities installed, maintained & clean |
No |
Yes
|
No |
6-201.11 Floors, Walls and Ceilings-Cleanability - C - Concrete that was poured for recent installation of drain is unfinished and not easily cleanable. Floor needs to be made smooth and easily cleanable. Floors, floor coverings, walls, wall coverings, and ceilings shall be designed, constructed, and installed so they are smooth and easily cleanable. |