|
5
|
4
|
Water quality: daily written records of water quality and test kit kept on site |
No |
No
|
No |
Observed records not maintained daily. If pool closed, notate as closed. Record chlorine, pH and main drain checks daily. Intent to Suspend issued.
.2535 (11) The pool operator shall inspect the pool at least daily and maintain written records.
Observed tube test kit used for chlorine, CYA and pH with staining on bottom where CYA could not be verified. Replace test kit. Intent to Suspend issued.
.2535(10) Provide test kit capable of measuring disinfectant level, cyanuric acid and total alkalinity. |
|
16
|
4
|
Premises: fence or barrier with self-closing, self-latching gates properly constructed and maintained |
No |
No
|
No |
Bleach fill line connected to building that provides perimeter fencing located less than 45" in height. Intent to Suspend issued.
.2528(a) Maintain 45" between bottom horizontal and next horizontal on fence and/or gate (post-May 2010).
Note: Double gates with one gate not locked in place. As maintenance gate, keep gate that does not self-latch, self-close locked at all times the pool is operable. |
|
21
|
4
|
Premises: pool and deck lighting provided at pools that operate at night |
No |
No
|
No |
Lighting verified as operable except for one light flickering in pool. Repair light. Operator indicated light was on order. Operator will provide photograph prior dawn or after dusk to ensure night swimming is permitted. |