|
5
|
4
|
Water quality: daily written records of water quality and test kit kept on site |
No |
No
|
No |
No log book. Maintain chlorine, pH, main drain checks and temperature log daily. Record alkalinity and acid weekly. |
|
29
|
2
|
Dressing and sanitary facilities: required fixtures provided, clean, and in good repair |
No |
No
|
No |
Water in restrooms >110 F. Maintain at 110 F or below. Hot water turned off until mixing valve installed. Return visit will be made within one week.
No paper towels, toilet paper or soap in the restrooms. Corrected during the inspection. |