6
|
6
|
Submerged suction outlets meet ASME/ANSI A112.19.8-2007. Single drains protected. (.2537, .2539) GPM= ____Field verification complete=____ |
No |
No
|
No |
New feature pump installed. Changed out Pentair CHII-NI-2F for CHII-NI-2A pump. PDSC form updated. |
|
7
|
4
|
Pool maintenance: pool walls and floor kept clean, free of debris and in good repair |
No |
No
|
No |
Some sand and debris on the pool floor. Clean regularly. |
|
8
|
4
|
Pool maintenance: surface skimmers (with weirs, baskets and covers) or gutters clean, in good repair, and functioning properly, no floating debris |
No |
No
|
No |
Some weirs missing. Corrected by operator. |
|
9
|
4
|
Pool maintenance: depth markings and no diving markers or signs visible and properly located |
No |
No
|
No |
One 4 foot depth marker on the pool deck cracked. Replace with non-slip 6x6 inch tile. - Intent to suspend item.
Depth markers at sunshelf denote six inches. Replace with non-slip 6x6 inch tile on deck and pool wall stating 0.5 or 1/2 FEET or FT. Depth markers shall be no more than 25 feet apart. - Intent to suspend item. |
|
16
|
4
|
Premises: fence or barrier with self-closing, self-latching gates properly constructed and maintained |
No |
No
|
No |
One gate not self-latching. Provide self-closing and self-latching gates. - Intent to suspend item. |
|
24
|
4
|
Equipment room: approved pump, filter, and flow meter operating properly |
No |
No
|
No |
Flow meter stuck. Repair or replace. |
|
25
|
2
|
Equipment room: equipment and chemicals kept in a dry, well-ventilated enclosure |
No |
No
|
No |
Chemicals stored in the pump room. Newly installed liquid chlorine and acid feeder for pool with drums of chemicals in the pump room. Store all chemicals in the chemical storage room. - Intent to suspend item.
General storage in pump room. Provide at least 3 feet clear walkway around equipment. |