|
16
|
1.50
|
Food-contact surfaces: cleaned & sanitized |
Yes |
No
|
No |
4-601.11(A) Equipment food contact surfaces and utensils shall be clean to sight and touch. -Pf. EHS observed a few plastic container with visible sticker debris presnt . Dishes were stacked so that sticker residue was touching the inside food contact surface. CDI Items were taken to dish area to be w/r/s. -1.5-
For more information, please visit: https://health.mecknc.gov/envhealth/food-and-facilities-sanitation or view our training videos at the following weblinks: Sanitizing Solutions - https://youtu.be/ykP2mr9CtRg , How to Test Sanitizer https://youtu.be/y0SjmnabFaY , and Cleaning and Sanitizing Food Contact Surfaces https://youtu.be/av1Rbh-lh08 . |
|
47
|
0
|
Equipment, food & non-food contact surfaces approved, cleanable, properly designed, constructed & used |
No |
No
|
No |
4-101.19/4-202.16 Non FOOD-CONTACT SURFACES of EQUIPMENT that are exposed to splash, spillage, or other FOOD soiling or that require frequent
cleaning shall be constructed of a CORROSION-RESISTANT, nonabsorbent, and SMOOTH material. NonFOOD-CONTACT SURFACES shall be free of unnecessary ledges, projections, and crevices, and designed and constructed to allow easy cleaning and to facilitate maintenance. EHS Obsevred rusted shelving throughout facility, replace. -0- |
|
49
|
0
|
Non-food contact surfaces clean |
No |
No
|
No |
4-601.11(C ) Keep non food contact surfaces of equipment clean to avoid build up of dust, food residue or debris.4-602.13 Non food contact surfaces of equipment shall be cleaned frequently to preclude accumulation of soil residues. EHS observed a dusty fan blowing on clean dishes. EHS advised facility should keep fan clean especially when using it to blow on clean dishes. -0- |
|
55
|
0
|
Physical facilities installed, maintained & clean |
No |
No
|
No |
6-501.11 Floors, walls, and ceilings including the attachments such as soap and towel dispensers; light fixtures; and heat/ac vents shall be maintained in good repair. EHS observed damage to flooring throughout facility. PIC stated the floors were going to be replaced next month. |