15
|
6
|
Premises: body hook and ring buoy with throw rope or lifeguard with rescue tube provided and properly located |
No |
No
|
No |
.2530(a) Lifesaving equipment includes body hook and pole and USCG approved ring buoy with required rope length.
Observed ring buoy rope exceeding 50 feet.
Corrected- CPO trims to required 42 feet. |
|
16
|
4
|
Premises: fence or barrier with self-closing, self-latching gates properly constructed and maintained |
No |
No
|
No |
.2537(b) All gates and doors shall be self-closing, self-latching.
Observed restroom door through leasing office onto pool deck not self latching. |
|
24
|
4
|
Equipment room: approved pump, filter, and flow meter operating properly |
No |
No
|
No |
.2518(g) Flow meter be capable of measuring 1.5 times the design flow rate.
Observed flow meter maxed out at 120GPM, and maximum flow of pump listed at 148GMP. Accurate reading cannot be taken during inspection.
CPO must replace with an accurate flow meter within 10 days or Intent to Suspend will be issued. Research out to EHS for verification.
*Note, new flow meter must measure 1.5x design flow rate; do not replace like-for-like, as present meter is undersized. |