|
24
|
4
|
Equipment room: approved pump, filter, and flow meter operating properly |
No |
No
|
No |
.2518(g) Keep flow meter operational. Flow meter stuck. CDI - Repaired during the inspection. |
|
25
|
2
|
Equipment room: equipment and chemicals kept in a dry, well-ventilated enclosure |
No |
No
|
No |
.2533(3) Provide continuous forced ventilation or cross ventilation in pump room. Vent fan not functioning in the chemical room. Repair. |