|
2
|
6
|
Water quality: disinfectant residual provided by |
No |
No
|
No |
Observed cl2 to be 0.1ppm. cl2 must be 1.0ppm or greater. |
|
5
|
4
|
Water quality: daily written records of water quality and test kit kept on site |
No |
No
|
No |
Observed logs not kept since May18th, 2016. Proper logs must be kept every day the pool is open to swimming. |
|
7
|
4
|
Pool maintenance: pool walls and floor kept clean, free of debris and in good repair |
No |
No
|
No |
Observed pool wall peeling. |
|
13
|
4
|
Pool maintenance: contrasting band on steps and benches |
No |
No
|
No |
Observed pool stairs not to have the required 2" contracting band at the edge. Correct this. |
|
15
|
6
|
Premises: body hook and ring buoy with throw rope or lifeguard with rescue tube provided and properly located |
No |
No
|
No |
Observed 1 ring buoy rope to be 35ft. long. Corrected to 33ft. as required. |
|
25
|
2
|
Equipment room: equipment and chemicals kept in a dry, well-ventilated enclosure |
No |
No
|
No |
Observed pump room floor wet from leaks. |
|
27
|
2
|
Equipment room: filter backwash discharged through an air gap |
No |
No
|
No |
Observed no air gap at back flow line. |
|
33
|
2
|
Dressing and sanitary facilities: hose bibbs and floor drains provided |
No |
No
|
No |
Observed no floor drains or hose bibb in pump room. |