6
|
6
|
Submerged suction outlets meet ASME/ANSI A112.19.8-2007. Single drains protected. (.2537, .2539) GPM= ____Field verification complete=____ |
No |
No
|
No |
.2539(c) All pools, prior to permit issuance, shall provide documentation to the Department to verify suction outlet safety compliance. Observed pool to have replaced main drain covers and to have plugged the skimmer equalizer lines at the pool wall, but not inside the skimmers. This requires a new PDSC form to be submitted for approval to the Health Department. This was not yet submitted and approved. |
|
8
|
4
|
Pool maintenance: surface skimmers (with weirs, baskets and covers) or gutters clean, in good repair, and functioning properly, no floating debris |
No |
No
|
No |
.2518(k) Install skimmer per manufacturer specifications and eliminate equalizer line plugs or plug per State requirements. Skimmer equalizer lines are plugged at the pool walls, but are not plugged inside the skimmers. Variations from the plugging process recommended by the State must be approved by the Health Department. |
|
16
|
4
|
Premises: fence or barrier with self-closing, self-latching gates properly constructed and maintained |
No |
No
|
No |
.2537(b) All gates and doors shall be self-closing, self-latching. Observed 1 pool gate to self close, but not self latch. This must be corrected. |
|
24
|
4
|
Equipment room: approved pump, filter, and flow meter operating properly |
No |
No
|
No |
Observed flow meter suck/inoperable. Repair.
.2518(g) Keep flow meter operational. |