|
5
|
4
|
Water quality: daily written records of water quality and test kit kept on site |
No |
No
|
No |
CPO not present on weekends. CPO must visit property on a daily basis. Intent to Suspsned issued. |
|
16
|
4
|
Premises: fence or barrier with self-closing, self-latching gates properly constructed and maintained |
No |
No
|
No |
Door to pool with pushbar not at 54". Must measure from ground to bottom of pushbar at 54". Intent to Suspend issued.
Gate from restaurant not self-closing, self-latching. Repair to self-close. Intent to Suspend issued. |
|
24
|
4
|
Equipment room: approved pump, filter, and flow meter operating properly |
No |
No
|
No |
Acid feeder could not be verified. Intent to Suspend issued. Feeder must turn off when pump is turned off. |
|
25
|
2
|
Equipment room: equipment and chemicals kept in a dry, well-ventilated enclosure |
No |
No
|
No |
Pump room floor wet due to leak around piping coming from pool. Keep pump room floor dry.
Fan in chemical storage room not operable. Provide continuous forced ventilation or cross ventilation. |