2
|
6
|
Water quality: disinfectant residual provided by |
No |
No
|
No |
Spa Bromine at .4 ppm. Corrected to 4.0 ppm during inspection. |
|
5
|
4
|
Water quality: daily written records of water quality and test kit kept on site |
No |
No
|
No |
Total alkalinity not recorded weekly. Missing some weeks. Record weekly. |
|
6
|
6
|
Submerged suction outlets meet ASME/ANSI A112.19.8-2007. Single drains protected. (.2537, .2539) GPM= ____Field verification complete=____ |
No |
No
|
No |
PDSC form for spa filtration indicates 1.5 hp pump. Actual pump 2 hp pump. Corrected PDSC form provided during inspection. |
|
25
|
2
|
Equipment room: equipment and chemicals kept in a dry, well-ventilated enclosure |
No |
No
|
No |
Valve from piping from heater leaking. Pump room floor wet. Repair leak and keep floor dry. |
|
27
|
2
|
Equipment room: filter backwash discharged through an air gap |
No |
No
|
No |
No air gap at backwash line to pit. Provide air gap. |
|
30
|
2
|
Dressing and sanitary facilities: approved water source, no cross connections |
No |
No
|
No |
Check valve for fill line ASSE1015. Does not meet rule of .2512. If ever replaced, replace with approved check valve. |