|
5
|
4
|
Water quality: daily written records of water quality and test kit kept on site |
No |
No
|
No |
No log of test on VacAlert for January. No log for March. Tested during site visit. Ensure monthly testing per mfg. requirements. |
|
7
|
4
|
Pool maintenance: pool walls and floor kept clean, free of debris and in good repair |
No |
No
|
No |
Some cracking in fiberglass. Does not warrant permit action. Continue to monitor. May require repair in the future if worsens. |
|
22
|
6
|
Premises: emergency telephone provided |
No |
No
|
No |
Phone not operable during inspection. Phone was getting busy signal when 911 dialed. Operator spoke with IT during inspection and had them update. All phones operational at end of inspection. Verified phone number, address and call back. |
|
25
|
2
|
Equipment room: equipment and chemicals kept in a dry, well-ventilated enclosure |
No |
No
|
No |
Pump equipment up ladder, no 3' clearance. Pool built 1984. .2533(c) Valves and controls shall be accessible to the pool operator at all times. Maintain 3 ft. clear walking space in pump room. |
|
29
|
2
|
Dressing and sanitary facilities: required fixtures provided, clean, and in good repair |
No |
No
|
No |
Hot water >115 F in restrooms. Maintain at 110 F or below.
One toilet not operable. Keep all toilets in good repair. One shower fixture missing fitting. Repair/replace. Keep all fixtures in good repair. One paper towel dispenser not operable. Keep operational. |