|
5
|
4
|
Water quality: daily written records of water quality and test kit kept on site |
No |
No
|
No |
Observed some gaps in record data. All daily and weekly checks must be properly kept. Chlorine, water temperature, pH, and main drain checks must be done every day the pool is open for swimming. Total alkalinity and cyanuric acid levels must be checked at least once a week. -CDI- The Director of Physical Plant Services, Dan Buie, was made aware of the gaps in data records and agreed to ensure that the daily and weekly checks are properly made. |
|
24
|
4
|
Equipment room: approved pump, filter, and flow meter operating properly |
No |
No
|
No |
Observed flow meter to be non-funcitonal. Repair flow meter. |