|
3
|
6
|
Water quality: pool water pH |
No |
No
|
No |
pH 7.0. Maintain between 7.2 and 7.8. Operator adjusted to above 8.4. Added Muratic Acid to bring it back down, according to instructions, acid must be added at least 2 hours prior to reopening the pool. - Immediate suspension item. |
|
5
|
4
|
Water quality: daily written records of water quality and test kit kept on site |
No |
No
|
No |
No records for last 2 weeks. No main drain checks. Pool using stabilized chlorine. Check at least weekly cyanuric acid (stabilizer). Check daily cl, pH, temperature, main drains and at least weekly total alkalinity and cyanuric acid. - Intent to suspend item. |
|
7
|
4
|
Pool maintenance: pool walls and floor kept clean, free of debris and in good repair |
No |
No
|
No |
Sand on pool floor. Maintain pool floor regularly, ensure filter is in good working order. Operator vacuumed pool. |
|
13
|
4
|
Pool maintenance: contrasting band on steps and benches |
No |
No
|
No |
More than 1 inch between tiles and edge of steps. Paint contrasting color band between tiles and step edge. - Intent to suspend item. |
|
17
|
4
|
Premises: decks unobstructed, properly drained, free of trip hazards |
No |
No
|
No |
Chairs to close to pool edge. Maintain at least 5 feet of clear walkway. Corrected by operator. |
|
22
|
6
|
Premises: emergency telephone provided |
No |
No
|
No |
Missing emergency phone signage. Corrected by operator. |
|
24
|
4
|
Equipment room: approved pump, filter, and flow meter operating properly |
No |
No
|
No |
Flow meter not operating correctly, reading more than it, or the filter is capable of reading. Replace flow meter with functional flow meter. - Intent to suspend item. |