17
|
4
|
Premises: decks unobstructed, properly drained, free of trip hazards |
No |
No
|
No |
Plant on pool deck at 4.5 ft to pool. Maintain 5 ft clearance around pool.
Deck drains covered with paint in some locations. Repair deck so drains properly. Intent to Suspend issued. |
|
24
|
4
|
Equipment room: approved pump, filter, and flow meter operating properly |
No |
No
|
No |
Flow meter not operational. Repair. |
|
29
|
2
|
Dressing and sanitary facilities: required fixtures provided, clean, and in good repair |
No |
No
|
No |
Water in restrooms >110 F. Maintain at 110 F or below. |
|
30
|
2
|
Dressing and sanitary facilities: approved water source, no cross connections |
No |
No
|
No |
Check valve on the fill line ASSE 1015. Built prior to current regulations. Provide check valve compliant with .2512. |