| Name | DAVIDSON BAKER SPORTS COMPLEX | | Address | 200 BAKER DRIVE
| | | | City/State/ZIP | | | Premise Type | 53 - Year-Round Swimming Pool | | County | Mecklenburg | | Inspection Date
| 2/8/2022 | | Final Score @ Grade | | | Inspection conducted with CPO Abe McClain. Due to COVID-19 precautions, inspection not signed by the operator.
Some chipped deck tiles along deck drain at deep end of the pool. Tiles > 5' from pool, recommend replacing damaged tiles with new tiles.
Pool with Paddock 2424 PCFC main drain covers. Covers and screws visually inspected on 1/13/2022. |
|