| Violation Item
| Demerits
| Violation Description
| CDI | R | VR |
|
|
5
|
4
|
Water quality: daily written records of water quality and test kit kept on site |
No |
No
|
No |
No records maintained since pool closed since October. Maintain daily record keeping for chlorine, pH and main drain checks. Weekly record keeping for cyanuric acid and total alkalinity. Intent to Suspend issued. |
|
7
|
4
|
Pool maintenance: pool walls and floor kept clean, free of debris and in good repair |
No |
No
|
No |
Some debris on outdoor pool floor. Keep pool clean. |
|
11
|
2
|
Pool maintenance: diving equipment, ladders, steps and handrails properly placed, in good repair |
No |
No
|
No |
Ladders in outdoor pool loose. Tighten/secure ladders. |
|
16
|
4
|
Premises: fence or barrier with self-closing, self-latching gates properly constructed and maintained |
No |
No
|
No |
Main gate entry with gate not fully closing. Repair gate to self-close, self, latch. Intent to Suspend issued. |
|
17
|
4
|
Premises: decks unobstructed, properly drained, free of trip hazards |
No |
No
|
No |
Coping beginning to crack/chip in some places on outdoor pool. No offsets >1/2". Monitor and repair if worsens. |
|
21
|
4
|
Premises: pool and deck lighting provided at pools that operate at night |
No |
No
|
No |
Three lights around pool outside not operable. Repair lights for night swimming approval. Intent to Suspend issued. |
|
23
|
4
|
Equipment room: chlorine or bromine automatic feeders that meet NSF Standard 50 |
No |
No
|
No |
No flow meter on chlorinator. Original construction. If repaired/replaced, install per NSF requirements. |
|
24
|
4
|
Equipment room: approved pump, filter, and flow meter operating properly |
No |
No
|
No |
No spare pump basket for outdoor pool pump. Provide spare pump basket. Intent to suspend issued.
Small leak at main drain line for indoor at valve. Repair leak. |
|
26
|
2
|
Equipment room: valves and pipes identified by color codes or labels |
No |
No
|
No |
Labeling on piping in pump room faded off. Relabeled during the inspection. |
|
27
|
2
|
Equipment room: filter backwash discharged through an air gap |
No |
No
|
No |
Backwash pit backing up during backwash. Pit shall be capable of flow. Operator plunged the drain and decreased flow of water for backwash to eliminate overflow. |
|
33
|
2
|
Dressing and sanitary facilities: hose bibbs and floor drains provided |
No |
No
|
No |
No hose bib and floor drain in restrooms. Original construction. Provide hose bib and floor drain. |