|
3
|
6
|
Water quality: pool water pH |
No |
No
|
No |
Pool pH at 7.0. Required at 7.2 to 7.8. Corrected to 7.2 during inspection. |
|
5
|
4
|
Water quality: daily written records of water quality and test kit kept on site |
No |
No
|
No |
Alkalinity not recorded weekly. Record weekly. Intent to Suspend issued. |
|
16
|
4
|
Premises: fence or barrier with self-closing, self-latching gates properly constructed and maintained |
No |
No
|
No |
One door not self-closing, self-latching. Getting stuck when opened. Located near locker room entry. Repair to self-close, self-latch. Intent to Suspend issued. |
|
18
|
4
|
Premises: lifeguards present or warning signs posted |
No |
No
|
No |
Some standing water on pool deck next to pool coping. Did not notice any build-up below water. Continue to monitor and keep deck free of standing water. |
|
24
|
4
|
Equipment room: approved pump, filter, and flow meter operating properly |
No |
No
|
No |
Flow meter not operational. Repair to operational. Intent to Suspend issued. |
|
25
|
2
|
Equipment room: equipment and chemicals kept in a dry, well-ventilated enclosure |
No |
No
|
No |
Floor in pump room/chemical storage room wet due to backwash of pump. Open pipe on side of backwash pit that allows overflow of water on to pump room floor which drains to chemical storage room. Keep pump room floor dry. |
|
31
|
2
|
Dressing and sanitary facilities: sewage disposed of in a properly operating sewage system |
No |
No
|
No |
Backwash water goes directly to drain without air gap. Install air gap or approved backflow prevention/check valve.
Water line check valve does not meet .2512. If ever replaced, replace with approved check valve. Original construction. |